Prospective first.
Auditable by design.
Qualifying Scout observations are timestamped before their future is known. RC1.9 adds initial-state commitments, append-only checkpoint/scanner audit events, explicit continuity tracking and a machine-calculated completion gate.
Loading completion-gate, continuity and checkpoint-capture state.
Four conditions. No manual green button.
Proof remains in progress until all frozen requirements pass at the same time.
Gate status loading…
Detected → 5m → 15m → 1h → 6h → 24h.
Captured checkpoints show future market state. Pending and failed checkpoints remain visible instead of being backfilled with hindsight.
Loading signals…
A larger prospective dataset is required before publishing mature hit-rate, expectancy or profitability claims. RC1.9 hardens evidence collection and completion measurement; it does not manufacture a performance record.
